Data center load growth and pumped storage
How pumped storage helps connect new load faster, and what DOE and FERC can do.

I turn energy regulation into evidence, briefings, and tools people use.
Based in Washington, DC, I'm a practitioner and advocate in federal energy permitting and wholesale power markets. I also design the materials and data tools that help decision makers act.
Lead author of three national hydropower reports, including a review of 4,819 licensing documents.
Fact sheets, maps, and web reports I wrote, laid out, and mapped myself.
A markets tracker, a national hydropower dashboard, and an AI research library.

Ten fact sheets I researched, wrote, and designed for meetings with federal agencies, the White House, and the Senate. Every map is my own, built in ArcGIS from Oak Ridge National Laboratory and other public data. Select a brief to read every page.
How pumped storage helps connect new load faster, and what DOE and FERC can do.
Untapped capacity at Corps dams and two process fixes.
Hydropower on Interior lands, with project examples.
Capacity under NOAA consultation and license trends.
Hydropower in national forests, with project examples.
Hydropower on BLM lands, with project examples.
Each state water quality condition rated against BAAJA, plus the 16 year path to certification.
All 47 land agency conditions rated against BAAJA, using FERC staff findings.
Project cases where FERC had to adopt conditions its own staff did not support.
Five Section 106 reviews at working plants, measured against BAAJA.
White papers, articles for Powerhouse, NHA's publication on hydropower policy and markets, and regulatory comments to FERC, five other federal agencies, and the California PUC.
NHA white paper, 2024
How challenges to America's first renewable resource threaten grid reliability and resilience.
Lead author
Read the paper
Department of Energy filing, Nov 2025
Author.
Read the comments
Powerhouse, Aug 2026
Why hydropower's physical inertia matters more as large data center loads swing grid demand.
With Sam Kalman
Read on hydro.org
Powerhouse, Apr 2026
How long duration storage can serve data center demand, and the financing and market changes it needs.
Read on hydro.org
Powerhouse, Sep 2025
Whether letting project sponsors fund faster environmental review could ease the coming wave of relicensing.
Read on hydro.org
Powerhouse, Sep 2024
A statistical look at the rise in license amendments since 2019 and the slower approvals that followed.
With Michael Purdie
Read on hydro.orgEPA filing, Feb 2026
Docket EPA-HQ-OW-2025-2929. Project managed with outside counsel.
View on regulations.gov
FERC filing, Feb 2026
Docket RM26-3-000. Project managed with outside counsel.
View on FERC eLibraryFish and Wildlife Service filing, Dec 2025
Docket FWS-HQ-ES-2025-0044 and FWS-HQ-ES-2025-0039. Project managed with outside counsel, Gaffney Law.
View on regulations.gov
NHA white paper, 2026
How the more than 60,000 MW of proposed pumped storage can supply the reliable power AI growth needs.
Lead author
Read the paper
Interior Department filing, Jul 2025
Docket DOI-2025-0005. Author.
View on regulations.gov
Army Corps filing, Apr 2025
Docket COE-2024-0004. Author.
View on regulations.gov
FERC filing, Jan 2025
Docket EL25-18-000. Author.
View on FERC eLibrary
FERC filing, May 2024
Docket RM22-2-000. Author.
View on FERC eLibrary
California PUC filing, Feb 2024
Docket R.20-05-003. Author. Built a coalition with pumped storage developers, including GreenGenStorage, behind the reply.
Read the comments
FERC filing, Nov 2023
Docket ER24-275-000. Author.
View on FERC eLibraryInteractive white paper, lead author
An empirical study of the conditions federal agencies attach to hydropower licenses. I read the licensing record with large language models, checked the results by hand, and built a five part web report that works on desktop and phone.

Software that turns scattered regulatory records into something people can search, track, and use.

Member product I conceived and led
I conceived this member product and took it from idea to launch. I ran discovery with members and agencies, wrote the roadmap, business case, and pricing model for NHA's Board, and managed the outside developer who built it. It is an AI research platform that gives cited answers, project timelines, maps, and a dashboard of extracted license conditions. I have demoed it to DOE.



A web app on a Python scraper that tracks meetings and filings across all seven U.S. grid operators and FERC. It scores each item for hydropower relevance, tags market topics, and feeds a weekly digest for NHA's Market Design Committee that reaches 159 subscribers with a 31% average open rate.
Open the calendar
I designed and built NHA's public map of U.S. hydropower, joining Energy Information Administration data with Oak Ridge National Laboratory asset records and EPA emissions factors.
Open the map on hydro.org
Interview, Aug 2026
Cardinal News
Interview, Jun 2026
Hydro Leader
Panel, May 2026
Western Governors' Association

Panel, Apr 2026
National Waterways Conference
Workshop, Mar 2026
Google Public Sector
Interview, Sep 2025
RTO Insider
Podcast, Dec 2024
Volts podcast
I built the statistical analysis from FERC eLibrary and PNNL data showing a 165% rise in non-capacity license amendments, with processing times nearly doubled, and briefed FERC Commissioners. Sen. Murkowski raised the findings in a Senate committee hearing, and FERC opened a Notice of Inquiry (RM26-3) to address the problem directly.
I built NHA's Army Corps permitting reform effort, from WRDA 2024 comments to an October 2025 meeting at the Pentagon with Adam Telle, Assistant Secretary of the Army for Civil Works. That work contributed to his February 23, 2026 memorandum directing the Corps to leverage non-federal hydropower investment at its facilities.
My comments on DOE's Speed to Power request proposed using DOE loan authority as a construction risk backstop for pumped storage, built on my geospatial analysis of planned data centers and pumped storage. That work grew into the Winning the AI Race white paper and opened a dialogue with DOE's Office of Energy Dominance Financing. EDF spoke at Waterpower Week in March 2026, began talks with NHA on the backstop, and briefed NHA's Pumped Storage Development Council. The paper also earned NHA a pumped storage panel at the Western Governors' Association workshop in May.